Have you ever seen formwork panels warp during pouring? It can be frustrating seeing your sheets start to warp, blister and sag. This will cause a delay to pouring as you will have to re-fix your panels. The concrete finish will also be poor and you could lose money.
By choosing the right shuttering plywood you can avoid many of these issues. Although the plywood will be similar in appearance from different suppliers it is important to know what to look out for. Below are some points to consider.
Panel Thickness
Fresh concrete is heavy so will put a lot of pressure on your formwork, especially on taller columns and deeper beams. Panel thickness should be the first thing to consider.
12mm, 15mm and 18mm are all very common. Thinner panels will be lighter and usually cheaper. However they can still be a suitable choice depending on your task. Contractors often use 18mm panels on slabs, beams and columns to give more flexibility to prevent deflection.
Ensure the panels are the right thickness for your formwork design. Consider the distance between your joists and supports, height of pour and pressure of concrete. Thin panels will sag between your supports if they are far apart. Talk to your site engineer to ensure you select the correct thickness.
Core Quality
When selecting your panel core make sure you are choosing a good quality panel. Good quality shuttering ply will have a high density core with equally layered wood veneers. This will give a strong panel with no bending.
Air pockets, overlapping veneers and repair of weak areas can cause issues. Panels with air pockets may appear perfect however will start to bend or delaminate in the area of the air pocket. Edge of panels should be tight, even and well bonded. Consider checking a few samples.
Film Faced Quality
Film faced panels will have phenolic film adhered to both sides. This will give you a smooth finish to your concrete and will prevent any issues with the wood due to moisture and alkaline wet concrete.
If you choose a good quality panel you will reduce any plastering and rework needed. If your concrete is out of the ground, a thin or poorly bonded film will start to scuff, delaminate and absorb water after a few pours. The surface of your concrete will show. Check that the film is even, no bubbles or patchy areas. Edges should be well sealed.
Waterproof Bonding
Concrete formwork is a wet process. Panels will be soaked during pouring, left in damp conditions, stripped and reused. Glue should be strong.
Check that your panels have PF (Phenol Formaldehyde) or MPF (Melamine Phenol Formaldehyde) gluing. These are well known for having a strong bond and are resistant to water and heat. Ask your supplier what type of gluing they use. This is a basic spec so a reputable supplier will be happy to tell you. If the panels are advertised as Waterproof Shuttering Ply but have a weak glue, after a few uses they will start to delaminate at the edges.
Cost and Reuse
Although cheaper panels may seem appealing, especially when you are ordering large amounts, consider the cost per use.
Cheaper panels may need replacing after a few pours which will mean ordering more and causing extra labour. Choosing a stronger panel will cost more but may last longer meaning you save on cost per use. How long the panels last will depend on how they are handled, release agent, how they are stored, cutting and site conditions. No one can guarantee how many times they will last. Talk to your suppliers to find out what you can realistically expect.
Size and Weight
Most panels will be 8 x 4ft. This means most formwork systems and practices will be suitable. Having standard size panels will help with cutting and reduce waste. Most will fit into most trucks and lifts.
Weight can be an issue. Heavier panels are more difficult to handle and fix in place. Especially if working on higher floors. Ensure panels arrive flat with square edges and well sealed edges. Warped panels will cause delays.
Standards and Supplier Checks
Even if you have a good sample you may receive a different batch. One of the hardest things to check is that you are receiving the same batch. This can be an important factor for larger projects.
Ask for technical information before ordering large amounts. Check thickness tolerances, glue type, veneer type and film quality. What quality accreditations do the manufacturer have? Ask for documentation. How long have they been supplying construction projects? Are they recommended by other contractors? Usually choosing a supplier who can answer detailed questions will be the safest option.
Quick Checklist
Before placing an order, check the following points:
- Thickness is suitable for your formwork design and pour conditions.
- Veneers are even with no gaps or air pockets on edges.
- Film is smooth, even and well bonded.
- Glue type (PF/MPF) is confirmed.
- Size and weight suitable for your team and formwork system.
- Edges are sealed and panels arrive flat.
- Technical information available.
- Accreditations.
- Sample matches bulk.
- Cost considered (cost per use).
Considering Jaguar Ply
If you are looking to compare brands we recommend looking into Jaguar Ply. Their shuttering ply has high density wood veneers and phenol formaldehyde film coating. Designed for heavy duty concrete formwork. They have a smooth mirror finish and can be provided as Boiling Water Proof (BWP).
They are available in 12mm, 15mm and 18mm. All in standard 8x4ft sizing. Can have MPF & PF gluing. Covers most formwork requirements. As with any supplier, ask for technical information relevant to your project.
Why It Matters
Although the cost of shuttering ply is minimal it can cause many issues if not chosen correctly. Choosing the right panels will make your site quicker to work on with a cleaner finish to the concrete. It will also reduce any replacement costs. Choosing a poor quality panel will cause delays and issues. Usually extra cost will be incurred mid project.
Conclusion
The best shuttering ply for contractors may not be the cheapest or most expensive option. It should be suitable for your formwork design and will last multiple uses. Ensure you check the thickness, core, film and glue. Consider cost per use and ask for technical information.
Consider the range from Jaguar Ply.
Frequently Asked Questions
What thickness should I choose for my shuttering plywood?
This will depend on your formwork design, distance between supports and pressure from concrete. 12mm and 15mm are best for lighter tasks whilst 18mm is often chosen for slabs, beams and columns. Confirm with your site engineer.
Why is film faced plywood used for concrete formwork?
The phenolic film gives a smooth finish to your concrete and will not affect the wood due to moisture. It can be reused more than standard plywood.
Should I choose shuttering plywood based on price?
No. Consider cost per use as cheaper panels may cost more to replace.
Explore the Jaguar Ply range and ask the team for technical information relevant to your formwork requirements. Visit jaguarply.com, call or WhatsApp +977-9801934393, or email ganeshplywoodgp@gmail.com.